Please note that electricity supply to Central Library may be disrupted on Sunday 19 Feb 2012 between 8.00 am to 10.00 am due to testing of the emergency electric power generator.
Electricity supply in Central Library may surge or fluctuate during the test. As a precaution, please do not use the electricity power points in the library building during this period as the power surge may damage sensitive equipment.
We apologize for the inconvenience caused.