Excavations supported by Diaphragm Walls 
Part 1
Part 2
Part 3
Pictures
Discuss Construction of Steel Sheet Pilings
Powerpoint 
Report 
self-Travelling
No vibration
Piling Works
PowerpointVideo clip – Grout Piling
Video clip – Silent Piling
Video clip – Vibro Piling
Silent Piling
Powerpoint
Report Caisson
Conventional caissons
ReportRooted caissons
Powerpoint
Report 
Vibration Control of Buildings, The Sub-Structure
Powerpoint
Report Retaining Wall – Punggol Waterway
Powerpoint
Report 
Discuss Construction of Bored Piles and Steel Piles
Powerpoint 
Report 
Video Clip
Differential Settlements
WebpageBasement – Innovative Diaphragm Wall System
Report
Appendix 
Slides 
Basement Waterproofing using membrane systems
Powerpoint
Report Basement Waterproofing – case study
Report    Powerpoint    Powerpoint 
Powerpoint    Video Clip    Video Clip
Video ClipUnderground Waterproofing
Powerpoint
Report  
Case Studies on  Diaphragm Walls
Powerpoint 
Report 
Video ClipTrenching
Powerpoint 
Report 
Underpinning
Powerpoint 
Report Micropiles Construction within MRT reserved line
Photos 
Report 
Pile Testing
Powerpoint 
Report 
Video Clip 1
Video Clip 2
Video Clip 3
Video Clip 4
Soil Characteristics and Their Relation to Foundation Selection
Powerpoint-1       Powerpoint-2 
Report-1       Report-2 
Report-3       Report-4 
Report-5       Report-6 
Report-7 
Controlling Water Movements
Report-1             Report-2             
Report-3             Animation1
Safety of Mobile Cranes
Report-1             Appendix-1
System Formwork
Powerpoint-1       Powerpoint-2 
Report-1             Report-2 
Report-3              Report-4 
Report-5              Report-6

Automatic Climbing Formwork
Report-1
Powerpoint-1 

Self Climbing Crane
Powerpoint-1       Powerpoint-2 
Report-1             Flash-1

Concrete Pumping
Powerpoint-1       Report 
Tower Crane
Powerpoint-1       Report-1
Report-2            
Facade
Report
 Precast Concrete Jointing
Report

Prefabrication Precast technology
Content
Report 

Roof
Powerpoint-1        Report-1

Skylights

Report-1

Skylights and Butterfly Roof System – Changi
Powerpoint-1        Report-1        Video Clip

Material Handling
http://www.geocities.com/constructiontechnology/

Material Handling
Report      Powerpoint      Video Clip
Video Clip     Video Clip     Video Clip
Video Clip     Video Clip

One Day Cycle
Report-1
Steel Structures
Report-1             Report-2 
Robotic Construction
Report-1

 

Scaffolding
Powerpoint-1  

Flood
Powerpoint-1  Report  Video1 Video2 Video3 Video4 Video5  Video6  Video7  Video8

Floating System
Powerpoint-1   Report-1   Video-1 

Undersea Tunnel Construction
Powerpoint-1   Report-1   Video-1 

Sustainable Construction

– Hemp Concrete Report-1   Appendix 

– Concrete Recycling  Report-1     Report-2     Powerpoint   Video Clip    Video Clip

 – Integrating Solar Panels on Building Facade Report-1   Powerpoint 

Video – 1

–          Bored piles
–          Barrette piles
–          Caisson construction – Capital Tower
–          Caisson construction – UOB

Video – 2
–          Peri – Automatic Climbing Formwork
–          Doka – Automatic Climbing Formwork
–          Precast waterproofing
–          Reinforced and pre-stressed concrete

Presentation of Major Assignment – Nov2009
Day 1 – Video
Day 2 – Video – Part A 
Day 2 – Video – Part B

Major Assignment – Nov2017
DTSS – report
DTSS – video

Major Assignment – Nov2018
Mass engineered timber – report
Subterrain
Demolition

Major Assignment – 2021 & 2022
Crane Hook
MRT
MET
Foundation
MBS Tower 4
Futuristic Crane
Dewatering